June/July 2005 -- the "after" photos
11/28/04 - 12/09/04 -- Cabinets, etc.
11/09/04 - 11/23/04 -- Outside almost done!
11/01/2004 - 11/06/2004 -- Siding, Sheetrock (downstairs)
10/26/2004 - 10/31/2004 -- Siding & Landscaping
10/18/2004 - 10/22/2004 - Sheetrock (upstairs), Porch Decking, etc.
10/03/2004 - 10/09/2004 -- Front Porch, Patio, etc.
09/27/2004 - 10/02/2004 -- Kitchen Rough-in, Stone Wall, etc.
09/23/2004 - Kitchen Demo!
09/22/2004 - Brick Removal & Yard Grading
09/21/2004 - Front Steps Demo, Mud Room Platform, Dig Porch Footings
09/13/2004 - 09/17/2004 -- Slabs, Screened Porch Start, etc.
09/07/04 - 09/11/04 -- More Master Suite Framing
08/27/2004 - 09/03/04 -- Roof Shingles & Slab Preparation
08/26/2004 - Master Suite - Getting ready to roof
08/25/2004 - Master Suite - Sheathing (part 2)
08/24/2004 - Master Suite - Sheathing (part 1)
08/23/2004 - Master Suite Roof Framing (continued)
08/20/2004 - Master Suite Roof Framing
08/18/2004 - Master Suite Ceiling (part 1)
08/17 - Master Suite Framing (finally, after a lot of rain)
08/10 - 08/11 -- Bedroom Floor Framing
08/06 - Garage Framing & Kitchen Doors
08/03 - 08/05 -- Ceiling demo and rebuilding
07/30/2004 - Removing the garage & family room roof
07/29/2004 - Sealing off the family room, etc.
07/27/2004 - Sheathing & Tray Ceiling
07/23/2004 - 07/26/2004 - Kitchen Framing
07/22/2004 - Steel Day
07/20/2004 - Killing time until the steel is ready
07/19/2004 - Digging rear porch footings & kitchen framing preparation
07/16/04 - Framing the kitchen floor
07/15/04 - Backfilling the Basement
07/11/04 - 07/14/04 - Rain Delay
07/08/04 - Stairway & Waterproofing
07/07/04 - Garage Extension Foundation
07/06/04 - Basement - Stairwell, etc.
07/02/04 - Basement Walls Continued
07/01/04 - Basement Walls
06/30/04 - Preparing the Footing Drains
06/29/04 - Pouring the Footings
06/25/04 - Tree Removal
06/24/04 - Driveway Excavation & Footing Forms
06/23/04 - Digging the Basement, Shrub Removal
Before Construction